Levels of Power Users in Artificial Intelligence | What Level Are You? | Vol059. Can AI Combine a Team’s Know-How into a Checklist That Works?

Three learners review open books together at a classroom table, with stacks of textbooks, stationery and a whiteboard in the bright room.

AI can help three people write a usable booth checklist when each knows a different part of the job. Its first draft should show who supplied each requirement, which jobs depend on one another and which disagreement still needs a decision. A fluent set of instructions can hide a clash that everyone would have spotted on the floor.

At Level 5, design a handover that a relief team can follow. At Level 6, delegate the collation of notes and proposed revisions within a private workspace. Test the result with this fictional storytelling booth, which opens at 09:20 and finishes its last story at 10:00.

  • Keep the three original notes and identify the source behind each checklist entry.
  • Resolve the panel-position disagreement with the people who understand its consequences.
  • Time the opening and closing sequences, then retest when the room becomes available later.

What does each person know that the others might miss?

Caretaker’s note C1. The room opens at 09:00. I need six minutes to position the table and another six to put the two panels around it. I do those jobs in that order. At closing, removing the panels takes four minutes. Folding the table takes six minutes and requires an empty tabletop.

Facilitator’s note F1. Once the table is in position, I need eight minutes to set out the story cards. I favour bringing the front panel forward so the storyteller can hear quiet voices. After the final story I need four minutes to pack everything on the tabletop.

Access lead’s note A1. The forward position blocks the approach from the side entrance. I propose the recessed panel position. After both panels are placed I need four minutes to walk the approach and check the seating arrangement. My check can overlap with the facilitator laying out cards. The team confirms there is room for the facilitator to work at the tabletop while the caretaker positions the panels. At closing there is also room to pack the cards while the panels come down.

What is a scheduling problem, and what needs a human choice?

Ask for a draft with columns for action, owner, earliest start, duration, dependency and source note. The assistant should flag the two panel positions. The event lead convenes the three contributors, asks them to try the recessed arrangement with a quiet speaker and records the agreed position, any remaining concern and who will review it. Only then should it appear as an instruction.

Assume the event lead records approval of the recessed position after the trial. Use the four jobs below to work out the earliest ready time. Then follow the closing sequence in the original notes. How soon after the last story can the room be clear?

JobStarts whenTimeSource
Position the tableRoom opens6 minCaretaker C1
Position both panelsTable is in place6 minCaretaker C1
Lay out story cardsTable is in place8 minFacilitator F1
Check approach and seatingBoth panels are in place4 minAccess lead A1
Opening jobs after the team agrees on panel position
Compare your answer

The caretaker positions the table from 09:00 to 09:06 and places panels until 09:12. The facilitator sets out cards from 09:06 to 09:14. The access lead checks from 09:12 to 09:16. The booth is ready at 09:16. At 10:04, panels and cards are packed and the caretaker can fold the table. The room can be clear by 10:10.

Will the checklist survive a change to one note?

Give a connected assistant read access to the three notes and the event lead’s dated decision on panel position and write access to a private checklist. It can propose dependencies and flag conflicts. The contributors retain their originals. The event lead signs off the sequence, and the access lead confirms the on-site check. The assistant cannot change room bookings or announce an opening. If that decision is missing, the draft should show both proposals and leave the choice open.

Now give a relief team a fresh caretaker note C2. The room opens at 09:08. All durations and dependencies remain. The first ready time moves to 09:24, four minutes after the advertised opening. A revised draft should surface that conflict and refer it to the organiser. It cannot quietly shorten the walk-through or promise visitors the old time.

Try a physical walk-through and record where the team actually waited. A colleague who can retest the checklist from the source notes provides Level 5 evidence. For Level 6, keep the assistant’s restricted run, the changed record, the held decision and the human signoff. Preserve the facilitator’s concern about audibility so the next team knows what to listen for.