VIEW THIS AS

Auto mode follows the Route Engine until you choose a viewpoint.

YOU ARE HERE

ROUTE CHECK

CONNECTED TO

WHAT NEXT

Use the canonical route for this room, or HELP if you are unsure.

How to use SuperIntelligence Efficiently | How Can You Use AI to Prioritise a Queue Without Letting Less Urgent Work Disappear?

Three students study around open books and worksheets in a shared classroom.

Use AI to help manage a queue by making the rules for priority, waiting time and capacity visible. An urgent task may need to move first, but important older tasks must not disappear simply because new requests keep arriving. Define what is waiting, what has started, what is blocked and what counts as finished. Give every deferred item an owner and a review point, while keeping exceptional decisions with responsible people.

This international guide follows Rosa, a fictional coordinator of a community learning resource desk. Every request, duration, score and policy is invented for practice. SuperIntelligence is the future-facing theme, not a claim of demonstrated general superintelligence today. The queue example concerns low-stakes resource work; it is not a scheduling policy for emergency, medical, legal or other consequential triage.

  • Define the unit of work, priority categories and waiting states.
  • Separate urgency, importance, readiness, age and estimated effort.
  • Protect capacity for older eligible work without overriding critical requirements.
  • Track blocked items and assign the next action to an owner.
  • Monitor waiting age, unfinished work and accepted throughput.
  • Use transparent exceptions and review overloaded queues rather than hiding delay.

Continue the series: Parts 85–88

Parts 81–84: knowledge updates, parallel work, teaching and information granularity · Begin the complete series

Full chapter index

Define the queue and work units
Apply priority and aging rules
Manage capacity and blocked requests
Audit fairness and waiting time
Learn and scale responsible prioritisation

1. Define what a work item represents

Rosa’s desk receives requests for public learning resources, such as correcting a worksheet or preparing an accessible copy. One item means one accepted request with a defined completion condition, not every message about it.

An AI assistant may group related messages into candidate items, but a person checks whether they describe one request or different needs. Duplicate work should not distort the queue.

Contents · Next chapter

2. Separate waiting, active and finished

A waiting item is accepted but not started. Active work has started and is not finished. A blocked item cannot progress until a known dependency is resolved; it may have started or not.

Finished means the agreed resource has been checked and delivered to the appropriate recipient. A generated draft is not automatically a finished item. Define each status explicitly.

Contents · Previous chapter · Next chapter

3. Establish the fictional waiting queue

At the start of Monday, Rosa has five ready requests: A (urgent, age 0 working days, 30 minutes), B (ordinary, age 6 days, 30 minutes), C (ordinary, age 2 days, 45 minutes), D (important, age 4 days, 60 minutes), E (ordinary, age 7 days, 30 minutes).

The invented desk has 120 minutes of usable Monday capacity. No request is already active, and there are no safety-critical emergencies. Age is counted since acceptance, in working days, at the stated review point.

IDCategoryWaiting age (working days)Estimated minutes
AUrgent030
BOrdinary630
COrdinary245
DImportant460
EOrdinary730
Fictional Monday opening queue, all ready, with 120 available minutes.

Contents · Previous chapter · Next chapter

4. Distinguish urgency from importance

Urgency refers to how soon the consequences of delay occur; importance concerns the significance of the outcome. A resource for a scheduled session may be urgent; a long-standing accessibility improvement may be important even without an immediate session.

Do not infer importance from message tone, job title or frequency of reminders. Establish defensible categories with those responsible for the service.

Related guide: finding the bottleneck.

Contents · Previous chapter · Next chapter

5. Define an explicit priority policy

For this practice, handle ready urgent work first, reserve at least 30 minutes per working day for an ordinary ready item waiting at least five working days if one fits, then allocate remaining time to important ready items before younger ordinary ones.

This invented rule protects some older requests but is not appropriate for every workflow. If critical urgent work consumes capacity, record an exception and review the displacement rather than silently dropping older items.

Contents · Previous chapter · Next chapter

6. Apply the rule to Monday

Request A uses 30 minutes. E is the oldest eligible ordinary item and uses the 30-minute protected allocation. D uses the remaining 60 minutes. The accepted plan is A, E and D, totalling 120 minutes.

B and C remain waiting. The policy has not magically completed every item, but E no longer loses its place just because a new urgent request arrived.

Contents · Previous chapter · Next chapter

7. Compare with a strict urgency-only queue

If the desk always handled new urgent requests and then importance, a stream of such items could repeatedly postpone B and E. This is a possible failure mode, not proof that every urgency-based system behaves that way.

Repeated deferral must be visible. Record the reason, the displaced item and the date for another review; otherwise the queue may look productive while certain needs remain unmet.

Contents · Previous chapter · Next chapter

8. Explain the next day with new arrivals

At Tuesday’s start, B is age 7 and C age 3 working days under the exercise’s convention. A new urgent request F requires 60 minutes; G is a new ordinary request needing 30. Tuesday has 120 available minutes.

F uses 60; B receives the protected 30; the remaining 30 fits G but not C. The policy permits fitting a ready younger item rather than claiming C is finished. C remains visible with an explicit next review.

DayPlanned sequencePlanned minutesStill waiting if plan completes
MondayA, E, D120B, C
TuesdayF, B, G120C
Conditional schedule under the fictional policy; a planned item is not finished until verified.

Contents · Previous chapter · Next chapter

9. Handle tasks that never fit

If C repeatedly needs 45 minutes and only 30-minute gaps remain, a fit-first rule may continually postpone it. The remedy is not to relabel its effort as 30. Reserve a longer slot or split the task only if meaningful intermediate work is possible.

A shorter task is not inherently more valuable. Measure whether larger jobs are repeatedly delayed and adjust capacity or the scheduling rule with the owner.

Contents · Previous chapter · Next chapter

10. Distinguish readiness from priority

Suppose D requires an approved source file that is unavailable. It may be important but not ready. Record the missing dependency and assign a named next action instead of placing it at the top of a ready queue that cannot execute it.

Keep blocked items visible. A missing source should trigger resolution work or escalation; it should not quietly reset the original waiting date.

Related guide: allocating limited resources.

Contents · Previous chapter · Next chapter

11. Keep separate age measurements

Waiting age measures time since acceptance for a not-started item in this exercise. In-progress age measures time since work started for an unfinished item. Total elapsed time to delivery includes both waiting and active periods.

These clocks answer different questions. The Kanban Guide defines work item age in relation to started but unfinished work; Rosa’s waiting-age measure is an additional local choice.

Contents · Previous chapter · Next chapter

12. Define capacity in usable terms

A nominal four-hour shift does not imply four hours of available resource production. Review, handover, breaks and other commitments may reduce usable time. The example stipulates 120 minutes after those constraints.

Ask AI to display assumptions about capacity separately from planned work. Do not schedule people as though every minute is interchangeable or ignore mandatory breaks and support duties.

Contents · Previous chapter · Next chapter

13. Manage work in progress

If the desk starts five items at once, each may wait for attention while none is delivered. In a low-risk trial the team can choose a small active-work limit, for example two items, and review whether it helps.

Do not confuse a limit on active tasks with a limit on people entitled to request a resource. Unaccepted requests and deferred work must still have transparent handling.

Contents · Previous chapter · Next chapter

14. Set escalation thresholds

A local review rule might require a coordinator to inspect any ordinary item waiting five working days or more, any item past a confirmed deadline, or any unresolved block lasting two review cycles.

These are fictional triggers for human attention, not automatic promises of completion. A trigger needs a named owner and a practical response, especially if several items trigger together.

Contents · Previous chapter · Next chapter

15. Avoid misleading priority scores

An AI-generated score such as 9.2 for urgency can imply accuracy that the evidence does not support. If numerical scoring is adopted, publish the factors, scales, weights and override policy and test unusual cases.

For small queues, clear categories plus waiting age may be enough. Do not use hidden personal attributes or unsupported inferences about whose request deserves attention.

Contents · Previous chapter · Next chapter

16. Give AI a bounded queue brief

Try: Here are the permitted work IDs, readiness, category, waiting age, estimated duration and available capacity. Apply this written policy, show your calculations and list every deferred or blocked item with a review point. Do not change the source queue.

Require reasons for exceptions and identify estimates or missing inputs. The responsible owner checks the proposal before any task is reassigned or promised.

Related guide: keeping work reliable through handovers.

Contents · Previous chapter · Next chapter

17. Calculate backlog changes correctly

If Monday begins with five requests and three finish, two remain. Tuesday adds F and G, taking the accepted backlog to four; if F, B and G finish, one remains. Across both days six of seven accepted requests have finished.

This assumes no new unrecorded arrivals or cancellations. It measures accepted items completed, not the fraction of community needs met or the quality of all work.

Contents · Previous chapter · Next chapter

18. Check waiting time distribution

The three Monday completions began that day with waiting ages 0, 7 and 4 working days; the oldest remaining item B has age 6 at the Monday opening review. The Wednesday review should show C’s updated age, not zero.

An average alone may hide a very old unresolved request. Inspect oldest waiting items, category-level delays and the actual elapsed time to completion using consistent timestamps.

Contents · Previous chapter · Next chapter

19. Distinguish estimates from promises

A 45-minute effort estimate for C does not establish when it will be delivered. There may be no available 45-minute slot until Wednesday, and the estimate may change after inspection.

Provide a conditional plan rather than an unsupported deadline. If a commitment exists, make it explicit and escalate when it cannot be met.

Contents · Previous chapter · Next chapter

20. Recognise sustained overload

If the desk can reliably complete about 120 minutes of work each day but receives work requiring substantially more every day, no ordering rule can remove the underlying excess demand without other changes.

Review demand, staffing, scope and process design. Do not hide overload by rejecting requests silently, relabelling unfinished work as complete or continually resetting acceptance dates.

Contents · Previous chapter · Next chapter

21. Audit exceptions and fairness

Review who or what category is repeatedly deferred, which requests are hard to fit, and whether exceptions are justified by the written policy. Include appropriate feedback from affected users.

A protected allocation does not guarantee equity. Real service obligations, accessibility requirements and stakeholder needs must guide the policy; high-stakes allocation requires specialised governance.

Related guide: keeping knowledge current.

Contents · Previous chapter · Next chapter

22. Practise with a changed queue

A fictional study group has 90 minutes: urgent task H takes 30; oldest ordinary task I takes 45; a newer ordinary task J takes 15. Under a rule reserving a fitting older task of at least 30 minutes, H and I fit, then J fits exactly.

Now change I to 75 minutes. H leaves only 60, so I cannot fit that day. Propose an explicit review or longer reserved slot, not a fake completion or an unapproved split.

Contents · Previous chapter · Next chapter

23. Connect queue management across zoom levels

A learner queues practice tasks, a teacher queues feedback, and a team queues resource requests. A large organisation may need service-level commitments, reliable data, capacity planning and appropriate escalation.

At every scale, keep the difference between importance, urgency, age, readiness and completion explicit. The rule itself must adapt to the purpose and consequences.

Contents · Previous chapter · Next chapter

24. Connect vocabulary, Ztime and EnDist

Vocabulary Coding and Engineering gives queued, started, blocked, finished, deferred and cancelled separate operational meanings. Preserve changes to status, original acceptance time and the rule version so later reviews remain interpretable through Ztime.

EnDist is a conceptual lens for useful progress after confusion, delay and rework, not physical energy or a validated score. A clearer queue may make progress more usable, but does not establish that every affected person benefits.

Read more: shared vocabulary · EnDist in Civilisation OS.

Contents · Previous chapter · Next chapter

25. Four weeks of practice

Week one: define work items and statuses, then create a small permitted queue. Week two: test a priority policy against synthetic arrivals and record all delayed items.

Week three: practise blocked, oversized and overloaded cases with explicit exceptions. Week four: review the age distribution, completion evidence and user feedback. Try another queue and explain why its rules may need to differ.

Contents · Previous chapter · Next chapter

26. Questions beginners ask and the next useful step

Should the oldest item always go first? No; urgency, obligations and readiness can matter. Can an aging rule guarantee nobody waits indefinitely? Not under persistent overload or unsuitable capacity. Is a draft a finished item? Only if it meets the defined delivery condition.

Start with a small queue of permitted tasks. Write the rule, schedule today’s available capacity, and give every deferred item a visible next review. Intelligence is useful when the work reaches the people who need it.

The Kanban Guide (May 2025) discusses explicit workflow definition, controlling work in progress and flow measurements. The waiting-queue policy, priority categories and numerical examples in this article are original teaching illustrations, not a formal Kanban implementation or a guaranteed fairness standard.

Contents · Previous chapter · Revisit the start of this collection