Use AI to test the assumptions that could change a decision before spending time making an estimate more precise. Write a simple model, identify uncertain inputs and vary them within defensible ranges. Find the point at which a preferred option changes, and check whether that point is plausible. Better intelligence is not always more decimal places: it is knowing which uncertainty matters to the choice.
This international guide follows Mira, a fictional coordinator planning a community workshop. All quantities, costs, options and thresholds are invented for learning. SuperIntelligence is the future-facing theme of this series, not a claim that present AI has demonstrated general superintelligence. A model can help organise sensitivity tests, but its scenarios are not measured demand, probabilities or a substitute for the responsible person’s decision.
- Define the choice and a comparable outcome before estimating.
- Separate fixed inputs, uncertain inputs and non-negotiable constraints.
- Change one assumption at a time, then test plausible combinations.
- Calculate switching values and compare them with credible ranges.
- Verify evidence for assumptions capable of reversing the choice.
- Document conditional conclusions and retain human judgement.
EDUKATE · VOCABULARY CODING AND ENGINEERING · PART 85 · TWENTY-SECOND COLLECTION
Find your next useful step
Continue the series: Parts 85–88
- Part 85: Testing sensitive assumptions — you are here
- Part 86: Searching across unfamiliar vocabulary
- Part 87: Designing bounded pilots and rollback
- Part 88: Prioritising work without indefinite delays
Parts 81–84: knowledge updates, parallel work, teaching and information granularity · Begin the complete series
Full chapter index
Establish the decision and model
Find the assumptions that matter
Test switching values and combinations
Verify and communicate uncertainty
Learn and extend the method
1. Define what the decision is actually about
Mira must choose one of two arrangements for the same two-hour workshop, with equivalent promised materials and accessibility in the invented case. The question is which arrangement costs less at the expected attendance, provided both meet the agreed requirements. If quality or access differs, the cost comparison is not sufficient.
Before asking AI to calculate, write the outcome, time period, available options and decision owner. A cheap option that fails a mandatory requirement is not a feasible option.
2. Write the two cost functions
Arrangement A has a fixed cost of 120 units plus 3 units per participant; B has a fixed cost of 60 units plus 6 units per participant. Let n mean the number of paying or covered participants for whom those variable costs actually apply, assumed equal to attendance here.
The model is A = 120 + 3n and B = 60 + 6n. This simple fictional relationship assumes no bulk discounts, tiered charges, taxes or capacity changes. Label those exclusions before using the result.
Contents · Previous chapter · Next chapter
3. Calculate a baseline without pretending it is certain
At an assumed attendance of 24, A costs 192 units and B costs 204. A is cheaper by 12 units under these inputs. The two calculations can be independently reconstructed from the formulas.
A baseline is a reference scenario, not an observed outcome. Keep the attendance assumption next to the result; a report saying only that A costs less hides the condition that makes it true.
Contents · Previous chapter · Next chapter
4. Separate inputs from requirements
The workshop must accommodate all attendees safely, have accessible facilities and fit the confirmed schedule. Those are feasibility requirements, not optional cost savings. In the fictional comparison both arrangements satisfy them for 12–30 participants.
A real coordinator would check actual room limits and arrangements. Ask AI to list requirements separately from adjustable assumptions, and never let a numerical score override an unresolved mandatory condition.
Related guide: finding valuable missing information.
Contents · Previous chapter · Next chapter
5. Choose plausible ranges rather than decorative precision
For this exercise Mira considers attendance between 12 and 30, not because the range has been measured but because it is stipulated for practice. In real planning, bookings, prior participation, and the cancellation policy might help establish a credible range.
A range should have a source or a named judgement owner. If no support exists, label it as exploratory rather than describing it as a confidence interval.
Contents · Previous chapter · Next chapter
6. Build a one-input sensitivity table
At n = 12, A costs 156 and B 132; at n = 18, A costs 174 and B 168; at n = 24, A costs 192 and B 204; at n = 30, A costs 210 and B 240.
The preference changes somewhere between 18 and 24. The baseline was not wrong; its conclusion was conditional. Ask the assistant to preserve the input and both totals on every row.
| Attendance | A (units) | B (units) | Lower cost |
|---|---|---|---|
| 12 | 156 | 132 | B |
| 18 | 174 | 168 | B |
| 20 | 180 | 180 | Tie |
| 24 | 192 | 204 | A |
| 30 | 210 | 240 | A |
Contents · Previous chapter · Next chapter
7. Find the switching value
Set the two expressions equal: 120 + 3n = 60 + 6n. Rearranging gives 60 = 3n, so the costs match when n = 20. Both cost 180 units at that point.
Below 20, B is cheaper; above 20, A is cheaper. At 20 the cost criterion alone does not distinguish them. Integer attendance makes the first strictly A-favouring count 21.
Contents · Previous chapter · Next chapter
8. Compare the switch with the plausible range
The switching count of 20 lies inside the invented range 12–30. Therefore the current cost recommendation is not robust across the whole range. The next valuable question may concern the likely attendance or a way to postpone the commitment.
A switching value outside a defensible range would be less immediately relevant for this particular model. It still does not prove the model captures every meaningful risk.
Contents · Previous chapter · Next chapter
9. Vary a second assumption
Suppose A’s fixed cost increases from 120 to 135 while all other inputs stay at their baseline values. The new break-even attendance is (135 − 60) / 3 = 25. At n = 24, A now costs 207 versus B’s 204.
This shows that a 15-unit change in one fee can reverse the original recommendation. Ask for a written explanation of the new threshold rather than relying on a generated graph.
Contents · Previous chapter · Next chapter
10. Distinguish sensitivity from uncertainty
A result may react strongly to a factor whose actual value is already firmly known. Conversely a highly uncertain input can have very little influence on the decision. Mira should distinguish the effect of a change from the credible size of the change.
An input deserves verification when uncertainty in it could matter enough to alter an action. Do not rank factors solely by how large their numbers look.
Related guide: estimating project resources.
Contents · Previous chapter · Next chapter
11. Test assumptions on a common basis
At n = 24, increasing A’s per-participant cost from 3 to 3.5 raises its total by 12 units, giving a tie. Increasing it to 4 gives A a cost of 216 versus B’s 204.
A change of 0.5 per participant and a change of 12 fixed units have the same cost effect at this attendance, although their units differ. The model helps compare consequences, not raw input magnitudes.
Contents · Previous chapter · Next chapter
12. Check several conditions together
If attendance falls to 18 and A’s fixed fee rises to 135, A costs 189 and B 168. If attendance rises to 30 and A’s fixed fee stays 120, A costs 210 and B 240.
One-at-a-time tests help isolate effects but may miss meaningful combinations. Build joint scenarios that are possible under the actual arrangements, not arbitrary mixtures of mutually incompatible assumptions.
| Scenario | Attendance | A fixed fee | A total | B total |
|---|---|---|---|---|
| Lower attendance, higher fee | 18 | 135 | 189 | 168 |
| Higher attendance, base fee | 30 | 120 | 210 | 240 |
Contents · Previous chapter · Next chapter
13. Do not invent probabilities
A plausible low, middle and high scenario does not establish a probability for any of them. Mira cannot calculate a reliable expected cost merely by calling the three scenarios equally likely.
If defensible probability information becomes available, more advanced analysis may be appropriate. For now report conditional costs, not a probability of success or a fabricated forecast.
Contents · Previous chapter · Next chapter
14. Identify nonlinear and threshold behaviour
Suppose A can host at most 25 people without an extra room and that room would add a fictional 80 units. At 30, A would then cost 290 instead of 210, reversing the original comparison with B at 240.
This is a separate hypothetical extension to the base model. Capacity steps, minimum charges and eligibility rules can change a cost function abruptly. Ask whether the original equation remains valid over the tested range.
Contents · Previous chapter · Next chapter
15. Test a decision that must be made early
If Mira has to book before attendance becomes known, she cannot always choose the cheapest option after the fact. She needs to compare the consequences of committing under uncertainty, including any genuine cancellation or change terms.
Do not assume flexibility is free. A reservation with a refundable deposit and one without may have different real decision boundaries even when their advertised prices match.
Contents · Previous chapter · Next chapter
16. Consider alternatives that reduce uncertainty
Mira could request an attendance confirmation before a deadline, seek a written quote, or ask whether an arrangement can be changed once numbers are known. Those steps may resolve the uncertainty more cheaply than refining every estimate.
The earlier article on missing information explains why the value of a check depends on its effect on the decision. Prioritise a verified answer that might change the choice.
Related guide: planning for uncertain futures.
Contents · Previous chapter · Next chapter
17. Give AI a bounded sensitivity brief
Try: Here are the formulas, units, constraints and assumption ranges. Recalculate both options, show switching values, identify feasible joint scenarios, and flag unsupported ranges. Keep baseline and alternatives distinct.
Ask for the intermediate arithmetic and a list of assumptions the tool did not check. A fluent explanation without a reconstructible calculation is not sufficient evidence.
Contents · Previous chapter · Next chapter
18. Check the calculation independently
At the switching count 20, substitute into both equations: 120 + 60 = 180 and 60 + 120 = 180. Then check one count on each side: at 19 A = 177 and B = 174; at 21 A = 183 and B = 186.
These boundary tests catch sign errors and reversed recommendations. Use an independent calculator or spreadsheet when the choice matters, rather than trusting agreement between repeated AI answers.
Contents · Previous chapter · Next chapter
19. Make a decision-sensitive assumption register
Record the assumption, value or range, source, effect on the decision, switching point, verification owner and next review. Mira’s attendance entry would record the range 12–30 and a switch at 20 under baseline fees.
If a quoted fee changes, create a revised model and mark which old scenarios are superseded. Preserve the relationship between a conclusion and the exact model used.
Contents · Previous chapter · Next chapter
20. Communicate uncertainty to a reader
A useful conclusion is: Under the stated cost model and confirmed feasibility, A is cheaper above 20 participants and B below 20; at 20 the costs tie. Our current attendance range includes both outcomes.
That tells a receiving person what to check. Avoid a single unconditional recommendation when evidence supports only a conditional one.
Contents · Previous chapter · Next chapter
21. Stop refining when it cannot improve the choice
Suppose a reliable booking record established exactly 30 attendees and both arrangements genuinely supported 30 without extra charges. Small changes that leave A below B may not require further research for a low-stakes choice.
But a new constraint can reopen the decision. Define what would trigger another review rather than claiming that a model is permanently settled.
Related guide: designing a fair test.
Contents · Previous chapter · Next chapter
22. Practise on a new decision
A fictional printer charges 40 fixed units plus 2 per booklet, while another charges 10 fixed units plus 5 per booklet. Set 40 + 2n equal to 10 + 5n: n = 10, with both totals 60.
Try 8 and 12 booklets independently. At 8, the second is cheaper (50 versus 56); at 12, the first is cheaper (64 versus 70). Explain how the underlying reasoning transfers without copying the original numbers.
Contents · Previous chapter · Next chapter
23. Connect the method across zoom levels
An individual can compare two study-resource arrangements; a teacher can test assumptions about workload; a team can compare operational designs. At institutional scales, specialist appraisal and stakeholder input become important as consequences grow.
The same idea is to examine which input changes the action, while the required evidence, complexity and authorisation vary with the scale.
Contents · Previous chapter · Next chapter
24. Connect vocabulary, Ztime and EnDist
In eduKate’s Vocabulary Coding and Engineering framework, an assumption, measured fact, scenario, constraint and decision threshold must remain different concepts. Record model versions and meanings so a later reader can reconstruct the claim: this is the Ztime perspective.
EnDist is a conceptual lens for useful forward progress after misunderstanding and rework, not physical energy or a validated numerical metric. Testing decision-sensitive inputs may save effort without guaranteeing that every decision improves.
Read more: shared vocabulary · EnDist in Civilisation OS.
Contents · Previous chapter · Next chapter
25. Four weeks of practice
Week one: build two small cost models and verify baseline values. Week two: vary one input and calculate a switch, testing each side independently.
Week three: add a realistic joint scenario or step charge. Week four: prepare a conditional recommendation with evidence, uncertainty and a review trigger. Test transfer on a different example without asking AI to provide the first solution.
Contents · Previous chapter · Next chapter
26. Questions beginners ask and the next useful step
Does sensitivity analysis predict attendance? No. Does a switch prove an option is best? Only within the stated model and decision criterion. Do scenario ranges imply probabilities? No. Is every uncertain value equally important? No; examine the action it could change.
Start with one genuine low-stakes choice, two comparable options and one uncertain input. Ask what value would change your decision, then check whether that value is credible before spending further effort.
HM Treasury, The Green Book (2026), discusses sensitivity analysis and switching values in public appraisal. This lesson adapts the broad reasoning principle to a fictional, much smaller decision; it is not a public-sector appraisal or financial advice.