“Likely”, “possible”, “high confidence”, “certain” and “estimated probability” do not mean the same thing. A person may say a delivery is likely without having estimated a probability. A scientific assessment may use calibrated likelihood phrases with stated numerical ranges. A research team may describe high confidence in a finding based on evidence and agreement, while its assessed probability concerns a separate proposition. An AI assistant that turns every likely into 80%, or every high confidence into a promise of correctness, is adding unsupported precision. Vocabulary coding and language engineering must preserve uncertainty’s type, source and interpretation.
The practical sequence is exact claim → event and population → uncertainty type → evidence and estimation method → explicit verbal or numeric expression → decision consequences → independent review. Ask whether the source expresses statistical variability, lack of knowledge, confidence in evidence, model prediction or a professional judgement. If the source uses a formal calibrated vocabulary, record the convention rather than assuming ordinary speakers use the same thresholds. This article explores uncertainty from words and forecasts to AI confidence labels, public communication, science, governance and historical records. Its uncertainty passport is a proposed design, not a formula assigning probabilities to every sentence.
- Possible: An outcome is not ruled out; that supplies no precise chance.
- Likely: Ordinary English is contextual unless a formal scale applies.
- Probability: A number needs event, population, timeframe and method.
- Confidence: The strength of evidence is not identical to the outcome’s probability.
- Calibration: Forecasts should be evaluated against observed outcomes.
- Base rate: The reference population shapes interpretation.
- Interval: A range needs an explicit statistical meaning.
- AI: Fluent certainty is not a validated score.
- Risk: Low likelihood need not mean low consequence.
- Governance: A forecast informs but does not authorise a decision.
The IPCC uses an explicitly calibrated language
The IPCC AR6 Synthesis Report Summary for Policymakers explains the assessment’s calibrated likelihood wording. Within that particular convention, likely refers to 66–100%, very likely to 90–100%, and virtually certain to 99–100% assessed likelihood. These definitions should not be imposed as a dictionary for all everyday speakers.
The IPCC also assesses levels of confidence, with labels such as low, medium, high and very high, based on evidence and agreement. The confidence descriptions do not convert directly into the numerical likelihood ranges. An AI summary that equates high confidence with a 90% chance has confused different parts of the reporting framework.
A probability needs a proposition
“There is a 60% chance” is incomplete without identifying an outcome, period, relevant population and conditions. A numerical expression cannot be interpreted reliably if the underlying event remains vague.
A semantic record should store what was forecast, by whom, on which date and under what assumptions. The score needs provenance and a suitable validation method, not just an attractive percentage in a user interface.
Likely in ordinary conversation is not a formal threshold
People use likely with varying expectations and cultural conventions. The stakes and surrounding dialogue can alter its interpretation. A manager saying delivery is likely tomorrow may be offering a rough expectation, not a calibrated probability.
Preserve the words and their source. Ask for a formal estimate when an actual numerical decision requires one; otherwise describe the uncertainty qualitatively. Do not fabricate a percentage because a model prefers tidy numerical outputs.
Confidence and likelihood are distinct
The IPCC Working Group I Chapter 1 describes how underlying evidence and agreement contribute to confidence assessments, while likelihood terminology concerns assessed probabilities where applicable.
A team may have high confidence in a finding that concerns a low-probability event. An AI system should record those two dimensions independently. A high-confidence label is not a promise that the event will occur, and a numeric event probability is not a rating of the researcher’s competence.
May expresses possibility or permission
“The device may fail” describes a possibility. “The worker may appeal” can describe permission under a procedure. The same English word serves different semantic functions.
A proposed typed meaning layer separates epistemic possibility, legal or procedural permission and physical capability. If a summariser treats all three as probability statements, it will miscommunicate rights and actions.
Could and might do not automatically encode numbers
Could and might can express uncertainty, hypothetical alternatives, politeness and unrealised opportunities. Their interpretation depends on context; neither always maps to a specific percentage.
A language assistant should avoid reverse-engineering exact probabilities from those words. Where the phrase is material, preserve its type and ask what source, event or governing procedure the speaker meant.
Calibration concerns repeated forecasts
In probabilistic forecasting, calibration is evaluated by comparing stated chances with observed frequencies over suitable collections of predictions. A system assigning a 70% chance to many comparable events should not consistently see only a small fraction occur if it claims calibration.
A single event that fails to occur does not prove a 70% forecast defective. Calibration depends on a sample, methodology and domain. A credible performance claim should report the evidence rather than deduce reliability from one convenient outcome.
Calibration is not the only property of a useful forecast
A system that always predicts a population’s average frequency may be calibrated in some conditions while adding little distinction among individual cases. Another system may issue varied predictions while producing systematic overconfidence.
Evaluation should consider discrimination, appropriate scoring and decision value as well as calibration. A source-limited explanation should not advertise one score as complete probabilistic competence.
Base rates are part of meaning
A rare event in a population can remain uncommon after a particular signal changes the estimate. A statement such as elevated risk is incomplete without knowing the reference group and comparison.
State the baseline and relevant population when available. Do not substitute data from one population into an individual or another community. The article offers a communication principle rather than a personalised medical or investment calculation.
Relative change is not absolute probability
A fictional event risk increasing from one in one hundred to two in one hundred has doubled in relative terms but risen by one percentage point in absolute terms. Both descriptions can be numerically correct.
The choice of wording influences what readers infer. Preserve the original baseline, comparison and units. An AI summary should not switch between relative and absolute claims without explaining the change.
Confidence intervals and credible intervals differ
A conventional frequentist confidence interval is produced by a procedure with intended long-run coverage under its assumptions. A Bayesian credible interval has a different interpretation within its posterior probability model.
Do not flatten both into “the true number has this probability of lying here” without specifying the framework. A semantic protocol should record the estimate type, model, relevant assumptions and uncertainty.
An uncertainty range is not a guarantee
A vendor may provide an estimated delivery window, a scientific team a model range and a policy a required deadline. These ranges can have different consequences even when expressed with similar dates or numbers.
Label forecasts, expectations, targets and binding commitments separately. A narrow estimate is not evidence that the real-world outcome is guaranteed, and the word guaranteed cannot arise merely from a calculation.
Missing evidence is not zero probability
An AI assistant may fail to retrieve current information about an event. That tells us its accessible evidence is incomplete, not that the event has no chance of occurring. A null result is not an observed probability of zero.
Use unknown or insufficient evidence rather than a numeric certainty invented from retrieval failure. If a decision requires a reliable current estimate, identify the needed source and professional or authoritative review. Uncertainty should remain honest rather than be hidden by a fluent answer.
Disagreement is not automatically a 50–50 probability
Two sources may disagree about an event’s occurrence, yet they may not be independent or equally reliable. Assigning 50% merely because there are two perspectives is not a justified estimation method.
Record the actual sources, dependence, observations and unresolved reasons for conflict. A quantitative model needs explicit assumptions. A language system should not convert an unresolved factual dispute into a precise probability simply to avoid saying unknown.
Likelihood and consequence are separate
An event can have a low chance of occurring but very serious consequences if it does. A decision about safeguards may therefore differ from the decision appropriate for a more frequent harmless event.
Describe probability, impact, available mitigation and governing duties separately. A low likelihood does not automatically authorise ignoring a warning, and a high likelihood does not by itself dictate the correct public policy. Legitimate institutions and relevant expertise remain responsible.
Generative AI confidence can be misleading
An AI model can write “I am certain” while citing weak or incorrect information. The phrase is language generated from the model’s behaviour, not necessarily a calibrated estimate that the specific proposition is true.
Separate textual confidence from actually evaluated predictive probabilities and source verification. A score, when available, may concern tokens, model-specific metrics or another quantity. The system should name what it measures before presenting it as confidence in truth.
Expert judgements require context
A professional may describe a forecast as likely based on experience and current evidence without having a validated probability model. That judgement may be useful in the intended field, but it does not automatically translate into a precise numerical chance.
Record the assessor, domain, evidence and date where consequential. Avoid treating an expert’s unquantified phrase as a calibrated forecast without a declared method. The strength of a source and the likely outcome are related questions, not interchangeable fields.
Verbal confidence is not a guarantee of sincerity
A speaker may sincerely believe a prediction that later fails. Another speaker may make a confident statement for persuasive reasons. The words alone cannot reveal the truth of the claim or the speaker’s private motive.
Use evidence and documented predictions where possible. Do not infer deceit from a failed probabilistic forecast, or competence from confident wording. A vocabulary system should represent what was asserted and what was subsequently observed without inventing hidden psychological states.
Conditioning changes the assessed probability
A probability about an event given a specific set of observations is not the same as the overall chance of that event. Removing a phrase such as among tested cases can change the population and the meaning of the number.
Retain the relevant conditions and data source. When two forecasts use different evidence, they may legitimately give different numbers. A semantic comparison should not call them inconsistent until it has aligned their event definitions and information sets.
A prediction has a date as well as a number
A forecast made last week refers to what was expected with information available then. After the event occurs, the forecast becomes historical evidence of an earlier estimate, not an editable record that should be rewritten to match the outcome.
Keep creation time, forecast horizon, source and later result separately. Ztime-style histories help preserve what people could know at each stage. Transparent forecast archives allow evaluation without implying that the forecaster possessed future information.
A model can be calibrated and still be biased in its coverage
A test set may consist mainly of easy or familiar cases. A forecast system can appear well-calibrated there while performing badly on a rare group, language or newly changing environment.
Describe the evaluation sample and check relevant subgroups or conditions when justified. Avoid assuming a score carries over automatically to populations excluded from testing. A quality claim should be bounded by its source data and appropriate monitoring.
Changing base rates can make an old model stale
When the frequency of an event changes, a probability model calibrated in an earlier setting may no longer perform as expected. The same input pattern can acquire different predictive value in another time or population.
Monitor actual outcomes and source updates. A model should not cite an old calibration report as permanent proof of current reliability. Version its estimates and correct public claims when material evidence changes.
An uncertain policy question is not only a forecast
A user might ask whether a permit is valid. That is often a question about operative documents, status and applicable rules, not an invitation to estimate a percentage from generic language.
Retrieve authoritative evidence and distinguish valid, invalid, pending, disputed and unknown as appropriate. Do not give a probabilistic guess about a person’s rights merely because a model can produce one. A formal decision depends on the competent system.
A forecast is not a promise
A delivery estimate describes expected timing. A contractual commitment may have different consequences and require real authority. Rewriting expected tomorrow as guaranteed tomorrow creates an unsupported obligation.
Identify whether the statement is a prediction, service target, offer or binding commitment under the relevant process. An AI assistant should not strengthen the speaker’s claim during a friendly rewrite. Actual authorisation remains separate from confidence.
Risk communication should preserve absolute quantities
A public explanation that says a risk increased substantially may be accurate relative to a tiny baseline while misleading about absolute chance. Readers often need both numbers to understand the consequence.
Preserve absolute event rates, comparison groups, time horizon and any uncertainty about the estimate. Use plain language to explain the calculation without making unsupported reassurances. The aim is understanding, not dramatic language.
A forecast range should state its statistical type
Some ranges describe percentiles of possible outcomes, some describe sensitivity scenarios, and others concern uncertainty in an estimated parameter. They are not one generic error bar.
Record the methodology and interpretation supplied by the source. Do not convert a scenario interval into a probability statement unless the original analysis supports it. A typed meaning layer helps prevent this category mistake.
A single event does not validate an uncertain prediction
A forecaster says an event has a 20% chance and it occurs. That outcome is not necessarily evidence of a defective forecast; rare outcomes happen under honest probability assignments.
Evaluate calibration and proper scoring over appropriate collections of comparable forecasts. For a single case, describe what occurred and retain the original forecast without rewriting it as certain in hindsight. This guards against misleading narratives of accuracy.
Translation of uncertainty can lose the intended strength
Different languages may use modal verbs, particles or conventional phrases that do not map one-to-one onto English likely, perhaps or should. A translated sentence may sound more certain or more obligatory than the source.
Provide the original source convention and ask qualified target-language reviewers to compare realistic examples. For formal calibrated vocabularies, preserve the stated ranges and separate them from cultural interpretation. Fluent translation is not automatic evidence of exact uncertainty equivalence.
A probability word can be rhetorically amplified
Media summaries may replace possible with inevitable or likely with certain, changing the audience’s understanding of the underlying evidence. The words can be close in topic while radically different in claimed strength.
A semantic audit should compare the source and headline for probability, time, scope and causal structure. Preserve material qualifications without burying the main point. Better writing communicates uncertainty clearly rather than making every sentence sound hesitant or absolute.
Scientific consensus and event likelihood are distinct
A large body of evidence can justify high confidence in a general finding while the likelihood of one particular outcome remains low. Conversely, strong statistical regularity may coexist with substantial uncertainty about a mechanism.
Report the finding, evidence and assessed outcome probability separately. Do not convert scientific agreement directly into an event-frequency figure. The IPCC example demonstrates how one organisation explicitly separates confidence and likelihood through its calibrated terminology.
An uncertainty passport can preserve the meaning
A proposed record could contain the event, population, time, source, exact wording, uncertainty type, numeric estimate if supplied, method, confidence-in-evidence assessment and applicable convention. It can also keep later corrections and observed outcomes.
This passport is a design proposal, not an IPCC, NIST or W3C standard. Its value lies in preventing invented precision and making assumptions reviewable. Legitimate qualitative uncertainty may remain qualitative; requiring a fabricated number would undermine the method.
A pilot can compare words with actual forecasts
Select a series of fictional or suitably sourced events with measurable outcomes. Record quantified predictions made before the outcomes are known, then evaluate observed frequencies across comparable cases using a documented procedure.
The sample should be sufficiently relevant for a meaningful evaluation and accompanied by uncertainty about the results. A small pilot can illustrate calibration without certifying a model’s future performance in every domain. Distinguish the experimental sample from broad claims about language.
Test AI paraphrases for overconfidence
Prepare source sentences using possible, an explicitly defined likely range, a numeric probability and a qualitative high-confidence assessment. Ask models to summarise them and check for fabricated percentages, dropped assumptions and changed modality.
Include faithful alternative wordings so the test does not reject every stylistic variation. Measure the rate of material meaning errors and false alarms under the intended task. A result helps assess the summariser, not prove that all human uncertainty has become computable.
Decision rights do not arise from probability
Even a well-calibrated prediction cannot independently settle whether a company should grant access, take a safety action or enact a policy. Decisions depend on costs, benefits, fairness, responsibilities and governing authority.
Present the forecast as evidence for decision-makers, not as an automatic instruction. Keep the source of legitimate permission separate from the source of the numerical estimate. A risk score must not grant itself a right to act.
A future universal language must retain uncertainty
Human communication often occurs before complete information is available. A system that forces every proposition into certain or false will invent answers and conceal disagreement. A system that allows uncertainty can still be useful and direct.
The realistic engineering goal is to preserve the type, source and scope of uncertainty through translation, AI analysis and revisions. Stable identifiers and versioned evidence can support this without pretending every human statement has one precise probability.
What the strongest result would demonstrate
A credible research programme could show that source-linked uncertainty types reduce misinterpretation of modal words and numerical claims in a defined set of AI tasks. It could assess whether readers better understand what was estimated and what remains unknown.
That result would not establish one universal scale for all cultures or guarantee correctness of every future forecast. A bounded demonstrable improvement is stronger than a grand assertion that language uncertainty has been solved once and for all.
Twelve zoom levels of uncertainty language
| Zoom | What is uncertain? | Possible failure |
|---|---|---|
| Word | Meaning of likely | Invented fixed percentage |
| Modality | Permission or possibility | May becomes must |
| Population | Reference group | Wrong base rate |
| Statistic | Quantified event | Missing denominator |
| Evidence | Strength of findings | Confidence becomes probability |
| Forecast | Future outcome | Promise invented |
| Interval | Meaning of the range | Wrong interpretation |
| AI | Model-generated assurance | Uncalibrated certainty |
| Time | Prediction versus later result | Hindsight rewriting |
| Risk | Probability and impact | Severity ignored |
| Governance | Who may decide? | Score creates authority |
| History | Old estimates and calibration | Stale performance claim |
A twelve-step uncertainty audit
- Identify the exact proposition and event.
- State the population and prediction horizon.
- Distinguish possibility, permission and numeric probability.
- Name a formal calibration scheme only when actually adopted.
- Do not invent a precise percentage from ordinary wording.
- Preserve baselines, units and comparisons.
- Keep confidence in evidence separate from event likelihood.
- Identify the model, expert judgement or statistical method.
- Retain conditional assumptions and interval types.
- Evaluate calibration against suitable observed outcomes.
- Describe risk consequences and decisions independently.
- Preserve forecast versions and later corrections.
Frequently asked questions
Does likely always mean 70%?
No. Everyday usage is contextual; an organisation can adopt formal numerical ranges for its own reports.
What does likely mean in the IPCC AR6 Synthesis Report?
Under the IPCC’s published assessment convention, it corresponds to an assessed likelihood of 66–100%.
What does very likely mean in that report?
The IPCC uses 90–100% assessed likelihood for very likely.
Does high confidence equal 90% probability?
No. The IPCC’s confidence level concerns evidence and agreement, while likelihood describes probability.
Can AI convert possible into a percentage?
It should not invent a precise chance without a justified estimation method and event definition.
What is forecast calibration?
A property of probability predictions assessed across suitable cases by comparing stated chances with observed outcomes.
Does one failed forecast prove poor calibration?
No. A probabilistic event can fail to occur even when its forecast was appropriate.
What is a base rate?
The underlying event frequency for a specified population or setting.
Why do relative and absolute risks matter?
A relative change uses a baseline comparison, while an absolute change states a difference in event frequency or probability.
Is a confidence interval the same as a credible interval?
No. Their interpretations differ under frequentist and Bayesian frameworks.
Does a low-probability event require no action?
Not necessarily. Severity, safeguards and applicable duties also matter.
What is the first useful AI test?
Check that a paraphrase of an uncertain source does not invent percentages, remove conditions or strengthen confidence.
Continue the Language Engineering series
- Why unknown is not false
- Causality and predictive claims
- Claims, evidence and verification
- Reliability objectives for AI language
- Events and actual completion
Primary uncertainty and assessment references
- IPCC AR6: Synthesis Report Summary for Policymakers
- IPCC AR6 Working Group I: Framing, Context and Methods
- NIST: AI Risk Management Framework
- Stanford Encyclopedia of Philosophy: Interpretations of Probability
- W3C: PROV-O provenance
Editorial scope (26 November 2026): IPCC calibrated terms have defined probability ranges only within the stated assessment conventions. Confidence, probability and interval estimates require distinct source-specific interpretations. The uncertainty passport and audit are proposed educational tools, not a validated algorithm for inferring numbers from ordinary speech. Fictional examples do not constitute individual medical, financial or safety forecasts.