Before buying a condo, ask the managing agent whether the lifts serving your unit are due for major work. Request the scope, approved schedule, funding decision and planned access during downtime. An estate can have working lifts today and an approved replacement project that affects both your move and your first year of costs.
A lift quotation, approval to proceed, funding decision and new Permit to Operate are different milestones. Check what has actually happened for the lift or bank of lifts you will use. If the work overlaps with completion, have your lawyer check any levy or payment affecting your lot.
- Find the lifts serving the unit, car park and entrance.
- Ask for the scope, minutes, funding and notices on phased closure.
- Check the actual alternative route if someone relies on step-free access.
- Confirm any levy and ask management about certification and operating permits.
Find the section you need
Chapters 1–3
Walk the real route from the entrance
Take the route from the pedestrian entrance and car park to the unit. Identify the lift number or bank serving each. Check whether another lift reaches the same level and whether it connects to the corridor without stairs. In a development with several blocks, lifts elsewhere may be irrelevant to the particular home. Ask which lifts are included in any works.
A buyer may arrive through the main lobby and leave through the basement. Try both journeys. A lift serving the lobby may have a different route from the car park. If a household member relies on a wheelchair, stroller or walking aid, walk the actual alternative as well. Ask the managing agent about restrictions on access between blocks and how routes are signed during works.
Ask about current condition and documented plans
A slow ride or old finish alone does not show which components need replacing. Ask management about the maintenance history available to buyers, recorded breakdowns and any professional assessment. If an agent says the lift has been upgraded, find out when and what work was done. Replacing decorative panels and replacing major equipment are different jobs.
Check what the management corporation strata title (MCST) has decided so far. It may have obtained a quotation, commissioned an assessment, approved works or already signed a contract. Request the relevant records through the appropriate channel. Keep the answer specific to the lifts you will actually use.
Back to contents · Next chapter
Separate partial modernisation from replacement
BCA’s lift modernisation guidance discusses the trade-offs of partial works and more comprehensive modernisation. Ask the managing agent what parts will be retained, which are being replaced and how that affects downtime, reliability and later work. A project described as modernisation can cover different components depending on the equipment and the approved design. The term on a notice is the beginning of the check.
If the estate has several lifts, ask whether all are in the same phase. Compare the numbers in the scope with the lifts you identified on your visit. A project could affect a bank serving one stack before it reaches another. Ask how management will communicate the date that each phase begins.
Read the decision rather than the headline
Find the proposal, meeting resolution and latest status. An agreement to obtain quotes differs from an approved budget or contract. If the motion was changed during the meeting, read the final wording. Ask whether the contract or latest notice has changed the planned scope or schedule.
For example, a condo may have approved only the first phase and retained a longer-term plan for others. Record the scope already approved and the parts still under consideration. A buyer can budget for a confirmed payment and separately note future uncertainty. If there is a discrepancy between the agent’s summary and the documents, ask management to clarify it before relying on either version.
Ask whether the project addresses the actual reliability problem
An estate may have replaced a controller or refurbished doors in an earlier project. Ask for the date, scope and current assessment. If breakdowns continue, management and its technical advisers can explain whether older retained parts, maintenance needs or another issue are relevant. A prospective buyer can use that information to understand the plan without trying to diagnose lift equipment.
Suppose the agent says the lifts were upgraded three years ago, while minutes show a project under consideration now. Both statements can be accurate. One may refer to a cosmetic or partial upgrade and the other to major replacement. Ask what the earlier project achieved and why further work is being considered. Put each project on its own line with the relevant lift numbers and dates.
Request a summary of the work that management can share and compare it with the latest resident notices. If there are several different opinions about the scope, use the most recent formal decision and ask about any later change. A project under study could be delayed or expanded before approval. Keep it separate from confirmed works when estimating inconvenience and cost.
Ask whether a partial project would require later phases and how they are expected to be funded. A buyer planning to stay many years may care about later phases even if the initial project does not affect the move. Use the available plan as context and label uncertain dates and costs. If the estate obtains new quotations after your viewing, ask whether the practical plan or funding assumptions have changed.
| Record | Question it answers | Use it for |
|---|---|---|
| Lift assessment or quotation | What components are planned to change | Scope and expected downtime |
| General meeting minutes | What was actually approved | Decision and funding status |
| Budget or levy notice | What will be paid and when | Cost for the estate and your lot |
| Works and access notice | Which lifts or routes may be unavailable | Daily access and moving |
| Permit to Operate | Whether the lift has the required operating authorisation | Confirming return to service after regulated works |
Back to contents · Previous chapter · Next chapter
Compare project cost, sinking fund and additional contributions
BCA describes the importance of planning for lift modernisation in the sinking fund. Its guidance gives a planning allowance of at least $120,000 per lift and notes that actual cost varies with features such as floor count, speed and technical requirements. Use the estate’s actual quotations and funding decision for your purchase. The planning allowance is not a quote or a figure payable by any individual buyer.
Ask whether the estate has allocated sinking funds to the project and whether a special contribution has been proposed or approved. A healthy-looking fund balance can be committed to several projects. Read the funding schedule and the relevant decisions. If an extra charge has been approved, request the notice and ask how it is apportioned and when instalments fall due.
Put the numbers into the purchase budget
Suppose an estate plans to fund part of a project from its sinking fund and the rest through an additional contribution. The prospective buyer needs the amount for their lot, the due dates and any instalments already paid. Ask a conveyancing lawyer to check who bears each amount under the transaction and the management corporation’s rights. A general statement that maintenance is up to date does not show whether a later instalment is due.
Give the lawyer the written notice, any current statement and the expected completion date. Ask about relevant records or certificates and what should be checked again near completion. Separate an approved future instalment from work merely being discussed. This matters if you need to reserve cash after completing the purchase.
Read the payment schedule as well as the amount
Ask management which decision establishes the amount and whether the funding is for all lifts or particular phases. If instalments are due, record each due date and the lot amount. Compare the notice with the current account statement. The statement can show payments already applied, while the notice can identify later instalments. Ask about both before treating the account as settled for a purchase.
Imagine a levy payable in three instalments, with one paid, another due just before completion and the final one due afterwards. Give your lawyer the notice and confirm who has agreed to bear each amount. Ask how that agreement is dealt with in the completion papers and how payment status will be verified. The estate’s statutory rights and the agreement between buyer and seller can be different questions. Check the applicable documents with your lawyer.
Keep the levy separate from a change in regular contributions. An estate might fund the project from reserves and later decide to raise recurring contributions, or it might adopt a separate levy. Check what has actually been decided and when each charge would begin. If the minutes contain a projection, label it as a projection. A future vote or decision could change the figures.
Use the information to compare what you need to fund after buying. A household might already have a budget for repairs and movers. If a lift levy or a change of move date adds another cost, make sure there is enough cash at the relevant time. Consider whether the access plan also creates a practical cost, such as a rescheduled move or a different loading route.
After completion, check the first account statement and the latest timetable. If something differs from the settlement papers, give the managing agent and lawyer the specific notice and date. Keep the issue tied to the lot and payment in question rather than treating it as a dispute about the entire lift project.
Back to contents · Previous chapter · Next chapter
Ask how the estate will phase the work
Management may take lifts out of service one at a time or organise works by block. Ask for the latest schedule, the affected lift numbers and the routes that will remain available. Find out how delays and emergency access arrangements will be communicated. Treat a projected date as an estimate until management confirms it.
A household moving in during the work should check whether movers can use a suitable lift and how bookings are made. Ask about size restrictions, access from the loading point and any dates when large deliveries are not possible. Keep the works schedule alongside the completion and move dates.
Test the fallback route in real life
Suppose the usual lift connects the basement and the unit’s floor. The proposed alternative might require walking outside to another lobby. Check whether it involves a ramp, steps or a restricted door. If your household regularly needs step-free access, ask how it will work during the exact phase that affects your block. Do not rely on a drawing alone where you can verify the route during a viewing.
Ask whether there is a contact for changes in access and how quickly residents will be told about an outage. If another person assists a family member or makes regular deliveries, give them the confirmed route and the current notices. A schedule is useful when the people relying on it can understand where to go on the day.
Walk the alternative with the people who will use it
Before relying on an alternative entrance, take the route as you would on a regular day. Begin at the actual parking bay, taxi drop-off or pedestrian gate. Check each door, ramp and lift along the way and ask whether any access card is needed. A route can be step-free on paper while depending on a door residents cannot use at night. Confirm the arrangements for the relevant phase of the work.
Consider a family with an older relative who travels regularly for appointments. If its usual lift will be out of service, ask where a driver can stop and how long the alternative walk takes. If the alternative uses another block, check whether the floors connect. Also ask about access for deliveries and emergency arrangements through management. Do not make assumptions based on a different block’s set-up.
A moving company may need a lift with sufficient dimensions and a reserved time. Ask management which lift can be booked, whether a protective lining or approval is needed and whether the loading route will be affected. Compare the permitted time with the planned completion and key handover. If the family needs an alternative day, record the cost and notice required to change the booking.
Ask management to explain how it communicates timetable changes. Follow the resident notices rather than relying on an earlier contractor estimate. Tell anyone helping with the move where to check the current route. If a household member cannot use the alternative safely, raise the issue before paying for a move date or committing to a property that depends on that access.
Back to contents · Previous chapter · Next chapter
Check what management needs to do
BCA’s guidance says the existing Permit to Operate ceases when a lift undergoes major alteration or replacement works. Its process calls for notification and approval of plans when required before work, registered contractors and appropriate supervision, followed by certification and an application for a new PTO. Check the requirements for the actual scope with management and the relevant professionals. These are tasks for the lift owner and appointed parties.
A buyer does not need to inspect the machinery. Ask management what status has been confirmed and whether it expects any steps before the lift can return to use. The end of physical installation, testing and permission to operate can be different dates. Do not arrange the move solely around a projected construction completion date.
Check the current notice after work
Ask how residents will be told the lift is ready and which routes are available. If a planned date moves, update the move and delivery arrangements before accepting a time slot. Verify any alternative remains suitable. Keep the contact for reporting a fault through the estate’s official route.
After the lift returns to service, ask about the maintenance arrangements if they are relevant to your purchase. The estate still needs regular maintenance and testing under the applicable requirements. A new finish or an informal announcement does not establish that every regulatory step has been completed.
Back to contents · Previous chapter · Next chapter
Compare practical and financial effects
Two homes can have similar purchase prices while presenting different costs and access during the first year. Compare any confirmed levy, regular contributions, access during work and moving expenses. Keep proposed future works in a separate note. Check whether the new lift would improve access or reliability and whether the household can manage the works period.
If a project was approved after your first viewing, ask for an update before committing or completing. Give the lawyer the latest notice and confirm whether any sale terms address the levy. Ask management whether the dates for the lift serving your unit have changed. Update only the affected parts of your budget and moving plan.
Keep a record you can use at handover
Record the lift numbers, the latest work notice, planned access, and any lot payment. Keep the seller or agent’s information separate from the management confirmation. If you have children, older relatives or deliveries scheduled, identify who will check the timetable before the day.
Once the transaction completes, review the first account statement and resident notices. Check what has already been paid and what remains. A buyer who understands both the project and the access arrangements can plan the move without treating the lift as just another item on the viewing checklist.
Compare a funded project with a project still being discussed
Imagine two condominiums with similar sale prices. In the first, management has approved the lift project and issued a notice showing an additional amount payable for the lot. In the second, the lifts are older but the project is still at the quotation stage. Put the confirmed payment for the first property into the budget and note the second project as uncertain. Ask how each affects your planned move and the cash reserve you will keep after completion.
A third possibility is a project funded from available reserves, with no separate levy presently approved. Ask whether the fund has been allocated and whether the estate expects to replenish it through future contributions. Read the relevant meeting papers rather than treating the absence of a current levy as proof that the monthly contributions will stay the same.
Before completion, ask your lawyer to reconcile the latest records for the lot. If the schedule changed, confirm what is due and when. If the site is in the middle of work, ask management which lift will serve the unit on the intended move date. Update the household plan only when the new position is clear.
Retain the management notices and the statement used for the purchase. After moving, compare the first bill and access instructions with that record. If a notice refers to a different phase or another bank of lifts, ask which one applies. This is more useful than assuming that all lifts in the estate return to operation together.
Back to contents · Previous chapter · Next chapter
Does an old-looking lift mean replacement is approved?
Ask for the assessment and actual resolution. Appearance alone does not establish the scope or status.
Will I pay a special levy for the lift?
Check the actual funding decision and lot notice. Ask your lawyer how a levy is treated in the sale.
Can residents use the lift as soon as physical work ends?
BCA requires a valid PTO for operation. Major alteration or replacement has a new permit process.
What should I check if the unit has a single step-free lift route?
Ask how the phase affects that route, and verify the alternative before committing.
Is BCA’s planning figure a quotation?
It is a budgeting reference. Use the estate’s actual contractor quotations and approved financial plan.
Back to contents · Previous chapter · Official sources and next reading