Top 100 Geothermal Energy Vocabulary Words | Dominica

A hot spring, a turbine and a household electricity meter belong to the same broad conversation, but they do very different jobs. This guide teaches 100 English geothermal energy vocabulary words through Dominica, helping you follow the route from underground heat to electricity and explain what an energy number actually means.

Dominica is a useful setting because its volcanic landscape and geothermal electricity development connect geology with engineering and public communication. In an account published on 26 August 2026, the Independent Regulatory Commission records 31 July 2026 as the plant’s Commercial Operation Date. That is a documented milestone, not proof that every expected effect on customer bills or system reliability has already been achieved.

Use the groups to follow heat, equipment, measurement and evidence, then try the invented gross-to-net calculation. Top 100 is an editorial learning selection, not a measured frequency ranking. Definitions and examples teach transferable English. Every numerical plant model, dialogue and operating scenario below is invented for learning; none reports Dominica’s actual hourly output, efficiency or customer charges.

First check the quantity, then the calculation

Try this claim: “A plant rated at two megawatts produced two megawatthours.” Is it complete? A power rating does not supply an operating interval or actual generation. If that relationship is unclear, begin with the units group and the workshop. Learning the word turbine will not repair a missing time quantity.

Now distinguish three stages: a forecast says what is expected; a commissioning report describes testing; a commercial-operation notice records a milestone. None automatically establishes a household’s future bill. A learner who calculates accurately but merges those stages needs source-reading practice. A learner who chooses the right report but loses the unit needs measurement practice. Diagnose the first unstable connection rather than calling the whole topic difficult.

Contents: choose a useful word group

Words 1–50

1–10: Heat beneath the ground

11–20: Fluids, wells and the subsurface

21–30: Equipment that converts energy

31–40: Heat transfer and physical change

41–50: Power, energy and units

Words 51–100

51–60: From generator to electricity users

61–70: Operating stages and system performance

71–80: Environmental and community questions

81–90: Reading costs and public claims

91–100: Explaining what the number supports

Worked example · Country context · Practice · Speaking and writing · Questions · Sources

WORD GROUP 1 OF 10

1–10. Heat beneath the ground

Back to contents

These terms explain the resource setting. A volcanic feature can invite scientific questions without establishing the characteristics of a particular electricity resource.

No.Word or termMeaning and usageNatural collocationOriginal example
1geothermalRelating to heat within the Earth.geothermal energyDominica’s geothermal development makes the adjective useful beyond a science glossary.
2geologyStudy of the Earth’s materials, structures and history.local geologyLocal geology informs a resource question that a landscape photograph cannot answer alone.
3volcanicRelated to volcanoes or volcanic activity.volcanic landscapeDominica’s volcanic landscape gives our reading a concrete geographical setting.
4heatEnergy transferred because of a temperature difference.heat transferHeat moves through the model before any electricity is generated.
5temperatureA measure of thermal state, distinct from total heat transfer.reservoir temperatureTemperature alone cannot tell us the total useful energy available.
6crustThe Earth’s outermost solid layer.Earth’s crustThe crust is a geological layer, not an electrical component.
7magmaMolten or partly molten rock below the surface.subsurface magmaMagma is not the fluid we assume flows through every power-plant pipe.
8hydrothermalInvolving heated water and geological material.hydrothermal systemA hydrothermal system connects water, heat and rock.
9fumaroleAn opening releasing steam or other volcanic gases.volcanic fumaroleA fumarole is a surface feature, not proof of a specified plant output.
10resourceA naturally occurring source that may be usable under relevant conditions.geothermal resourceA resource requires investigation before its commercial potential is established.
1–10: Heat beneath the ground

Geothermal means relating to heat within the Earth. Hydrothermal concerns the interaction of heated water and geological material. A surface photograph cannot measure underground temperature, permeability or sustainable production.

Contents · Next group

WORD GROUP 2 OF 10

11–20. Fluids, wells and the subsurface

Back to contents

A geothermal system involves pathways, pressure and measurement. These are reading terms for understanding published accounts, not instructions for drilling or operating equipment.

No.Word or termMeaning and usageNatural collocationOriginal example
11reservoirA subsurface volume containing usable geothermal fluids in this context.geothermal reservoirReservoir need not mean a large hollow underground lake.
12permeabilityThe ability of material to allow fluid to pass through connected spaces.rock permeabilityPermeability concerns pathways rather than temperature alone.
13porosityThe proportion of void space within a material.rock porosityPorosity and permeability are related but not interchangeable properties.
14fractureA break in rock that may affect fluid movement.rock fractureA fracture can provide a pathway, depending on its condition and connections.
15wellA borehole constructed for access to subsurface fluids or measurements.production wellA well’s role must come from the project record.
16boreholeA drilled hole into the ground.exploratory boreholeThe borehole supplies information rather than an automatic generation guarantee.
17casingA lining installed to support or isolate parts of a well.well casingCasing belongs to the well system in our labelled diagram.
18productionExtraction of geothermal fluid for use, in this technical context.fluid productionFluid production and electricity generation name different stages.
19reinjectionReturning fluid underground through a defined system.geothermal reinjectionReinjection is a general process whose local details need documentation.
20pressureForce per unit area within a fluid or other system.fluid pressurePressure and flow rate require different units.
11–20: Fluids, wells and the subsurface

Reservoir does not necessarily mean an underground open lake. In geothermal discussion it can describe a volume of permeable rock containing fluids. The general definition should not be mistaken for a map of Dominica’s actual subsurface.

Contents · Previous group · Next group

WORD GROUP 3 OF 10

21–30. Equipment that converts energy

Back to contents

Each component has a role. A turbine converts energy in a moving fluid into shaft motion; a generator converts mechanical energy into electrical energy. Keeping those roles distinct makes the system easier to explain.

No.Word or termMeaning and usageNatural collocationOriginal example
21turbineA rotating machine extracting energy from a moving fluid.steam turbineThe turbine supplies shaft motion to the generator in the simplified account.
22generatorA device converting mechanical energy into electrical energy.electrical generatorThe generator does a different job from the heat exchanger.
23shaftA rotating member transmitting motion and torque.turbine shaftThe shaft connects two mechanical roles in our diagram.
24heat exchangerEquipment transferring heat between media without requiring their mixing.geothermal heat exchangerA heat exchanger can connect two separate fluid circuits.
25working fluidA substance carrying energy through a thermodynamic process or cycle.secondary working fluidThe working fluid needs to be identified before the cycle is explained.
26condenserEquipment converting vapour to liquid by removing heat.plant condenserThe condenser belongs on the cooling side of the model.
27pumpA device moving fluid or raising its pressure.circulation pumpThe pump uses energy that belongs in the internal-use account.
28valveA device controlling fluid passage through a system.control valveThe valve symbol indicates a control function rather than an electrical generator.
29cooling systemEquipment removing unwanted heat from a process.plant cooling systemThe cooling system reminds us that not all input heat becomes electricity.
30binary cycleA geothermal conversion arrangement using a separate secondary working fluid.binary-cycle plantBinary cycle names a general technology, not a verified project-specific label here.
21–30: Equipment that converts energy

Binary-cycle is a general plant type using heat transfer to a separate working fluid. It is included for technical reading, not as an unsupported identification of every component or process used by Dominica’s project.

Contents · Previous group · Next group

WORD GROUP 4 OF 10

31–40. Heat transfer and physical change

Back to contents

These process words connect the resource with equipment. The same word may appear in ordinary conversation, but the technical sentence needs a clear substance, direction and condition.

No.Word or termMeaning and usageNatural collocationOriginal example
31conductionHeat transfer through material without bulk movement of that material.heat conductionConduction through rock differs from fluid carrying heat along a pathway.
32convectionHeat transfer associated with bulk fluid movement.fluid convectionConvection supplies a movement relationship in the simplified diagram.
33boilingVaporisation occurring within a liquid at relevant pressure and temperature conditions.boiling pointBoiling depends on pressure as well as temperature.
34evaporationVaporisation from a liquid surface.surface evaporationEvaporation is not the same process as electrical generation.
35condensationChange from a gaseous phase to liquid.steam condensationCondensation releases heat that the model must account for.
36steamWater in its gaseous phase.geothermal steamSteam and the visible white cloud above hot water are not identical descriptions.
37liquidA fluid state with a definite volume but no fixed shape.hot liquidA hot liquid can carry energy without already being steam.
38phaseA physically distinct state or portion of a system.phase changeA phase change and a change in electrical voltage are different events.
39flow rateThe quantity of fluid passing a point per unit time.fluid flow rateState whether the flow rate measures mass or volume.
40thermal efficiencyThe proportion of heat input converted to useful work in the defined process.conversion efficiencyThermal efficiency needs a stated input, output and boundary.
31–40: Heat transfer and physical change

Boiling, evaporation and condensation are different processes. Steam is water in its gaseous phase; the visible cloud commonly seen above hot water consists mainly of tiny liquid droplets. Use the phase distinction when explaining a diagram.

Contents · Previous group · Next group

WORD GROUP 5 OF 10

41–50. Power, energy and units

Back to contents

These words prevent common errors in energy news. A unit tells the reader what kind of quantity a number represents. Always retain it through the calculation.

No.Word or termMeaning and usageNatural collocationOriginal example
41powerThe rate of energy transfer or work.electrical powerOur power value is constant only because the exercise says so.
42energyA quantity transferred or converted through work, heat or other processes.electrical energyEnergy over an interval cannot be reported using only a megawatt figure.
43wattThe SI unit of power, equal to one joule per second.one wattA watt measures a rate, not the total energy used in a day.
44kilowattOne thousand watts of power.kilowatt ratingA kilowatt rating needs an operating time before energy can be calculated.
45megawattOne million watts of power.megawatt outputThe invented plant’s megawatt output is not a measurement from Dominica.
46kilowatthourEnergy equal to one kilowatt sustained for one hour.kilowatthour consumptionA kilowatthour is an energy unit rather than a power unit.
47megawatthourEnergy equal to one megawatt sustained for one hour.megawatthour generationThe result is nine megawatthours in the first invented case.
48capacityA stated potential or rated output under specified conditions.installed capacityCapacity and actual generation should keep separate labels.
49grossBefore specified deductions; here before internal plant electricity use.gross generationGross output is larger than net output in our stated model.
50netAfter specified deductions; here after internal electricity use.net generationNet generation reaches the chosen export boundary in the exercise.
41–50: Power, energy and units

A megawatt is a unit of power; a megawatthour is a unit of energy. Multiplying a constant power by an interval gives energy. A capacity figure is not an automatically achieved output for every hour.

Contents · Previous group · Next group

WORD GROUP 6 OF 10

51–60. From generator to electricity users

Back to contents

Generation is one part of a wider electrical system. These terms help connect a plant with networks and customer demand without assuming a new source removes every other operational requirement.

No.Word or termMeaning and usageNatural collocationOriginal example
51gridAn interconnected system for transmitting and distributing electricity.national gridDominica’s grid remains a system, not simply another name for one plant.
52transmissionBulk movement of electricity through the relevant network.transmission networkTransmission connects generation with other parts of the supply system.
53distributionDelivery of electricity through networks towards end users.distribution systemDistribution performs a different role from the underground resource.
54substationA network installation for switching, transformation or related functions.electrical substationThe substation belongs to the grid side of our reading diagram.
55transformerEquipment changing alternating electrical voltage through electromagnetic induction.voltage transformerA transformer does not create additional energy simply by changing voltage.
56voltageElectric potential difference.grid voltageVoltage is not a synonym for the amount of energy generated.
57frequencyThe number of alternating-current cycles per second in this context.grid frequencyFrequency needs a unit and a specific measurement context.
58demandThe rate of electricity use required at a time or over a stated interval.electricity demandDemand changes while a plant’s nameplate rating can stay fixed.
59dispatchOperational direction of generation or other electricity resources.generation dispatchDispatch is an operational decision rather than a guarantee of full output.
60loadThe electrical demand placed on equipment or a system.system loadLoad must be compared with the relevant available supply.
51–60: From generator to electricity users

Transmission and distribution refer to different network roles. Dispatch concerns operation; a supply contract concerns an agreement. Neither a contract nor an installed rating guarantees that every unit will be available at every moment.

Contents · Previous group · Next group

WORD GROUP 7 OF 10

61–70. Operating stages and system performance

Back to contents

Energy projects pass through stages, and an operating system has measurable conditions. The language should distinguish completion of a test from evidence of sustained performance.

No.Word or termMeaning and usageNatural collocationOriginal example
61commissioningTesting and preparation of a system before its intended service.plant commissioningCommissioning and commercial operation belong to different stages of the record.
62commercial operationThe contractual or operational stage reached after relevant requirements are met.Commercial Operation DateThe regulator gives Dominica’s Commercial Operation Date as 31 July 2026.
63reliabilityThe ability of a system to perform its required service under stated conditions.supply reliabilityReliability requires evidence over time, not only an opening announcement.
64availabilityReadiness or ability to operate under a stated definition.plant availabilityAvailability does not mean the plant is dispatched at maximum output.
65outageA period when equipment or supply is unavailable.planned outageThe invented outage shortens our generation interval by one hour.
66interruptionA break in supply or operation.supply interruptionAn interruption needs its own cause and duration in the record.
67rampTo increase or decrease output at a specified rate.ramp outputA ramp describes changing output rather than a fixed rating.
68reserveCapacity or another resource held ready for relevant contingencies.operating reserveReserve is a system role, not proof that every interruption is harmless.
69monitoringRepeated observation or measurement to track conditions.performance monitoringMonitoring compares actual performance with a defined question.
70maintenanceCare and work intended to retain or restore condition and function.planned maintenanceMaintenance belongs in an availability discussion as well as a budget.
61–70: Operating stages and system performance

Commissioning and commercial operation are different stages. Availability concerns readiness to operate under a stated definition, while actual generation measures energy produced. A plant can be available without being dispatched at full output.

Contents · Previous group · Next group

WORD GROUP 8 OF 10

71–80. Environmental and community questions

Back to contents

A resource can offer benefits while still requiring environmental assessment, monitoring and public communication. These words help ask specific questions rather than rely on broad labels.

No.Word or termMeaning and usageNatural collocationOriginal example
71renewableReplenished through natural processes on relevant timescales.renewable resourceRenewable does not mean a project has no environmental questions.
72emissionRelease of a substance into the environment.plant emissionsAn emission claim needs a substance, boundary and measurement method.
73assessmentSystematic evaluation against stated questions or criteria.environmental assessmentAn assessment is a process rather than an automatic approval of every claim.
74baselineA reference condition used for later comparison.environmental baselineA baseline should be comparable with the later measurement.
75mitigationAction intended to reduce an adverse impact or risk.impact mitigationMitigation should specify the impact it addresses.
76consultationSeeking and considering views in a decision process.community consultationConsultation needs a documented process rather than an assumed consensus.
77stakeholderA person or group affected by or interested in a matter.project stakeholderA stakeholder may have a different question from the project operator.
78water qualityWater’s properties considered against specified uses or criteria.water-quality monitoringWater quality requires measurements, not a conclusion from colour alone.
79footprintThe area or wider impact associated with an activity, with scope stated.project footprintFootprint is meaningful only after we specify what it measures.
80resilienceThe capacity to withstand, adapt to or recover from disruption.system resilienceResilience includes more than the normal output of one generator.
71–80: Environmental and community questions

Renewable does not mean free from every impact. A project-specific environmental claim needs its own evidence, boundary and time period. A general technology account cannot establish every local outcome.

Contents · Previous group · Next group

WORD GROUP 9 OF 10

81–90. Reading costs and public claims

Back to contents

These terms support comprehension of official communications. The guide explains their meanings and does not estimate any household’s charges, recommend a tariff or predict investment returns.

No.Word or termMeaning and usageNatural collocationOriginal example
81tariffAn officially applicable structure of prices or charges.electricity tariffThe current tariff needs its own official notice.
82billA statement of charges for supplied goods or services.electricity billA bill depends on relevant use and charges, not one generation headline.
83consumptionThe amount of energy used over a stated interval.energy consumptionConsumption is measured over time rather than inferred from an appliance’s presence.
84chargeAn amount payable under a pricing arrangement; a financial sense here.fixed chargeCharge has several meanings, so this sentence specifies a billing term.
85contractAn agreement establishing parties’ rights and obligations.supply contractThe contract and the actual energy delivered answer different questions.
86regulatorAn authority supervising a specified sector or activity.electricity regulatorDominica’s regulator supplies the dated commercial-operation account used here.
87forecastAn evidence-based prediction about future conditions.generation forecastA forecast should not be reported as an already measured outcome.
88targetA desired future result or level.policy targetA target and an achieved result require different verbs.
89outcomeA resulting condition or change.customer outcomeA customer outcome needs observation rather than a promise repeated as fact.
90verificationChecking that evidence supports a stated result or claim.independent verificationVerification begins by identifying exactly what is being claimed.
81–90: Reading costs and public claims

A tariff describes the applicable pricing structure, while a bill combines relevant charges and use. A generation milestone alone does not determine either. Read the current official notice for any actual customer decision.

Contents · Previous group · Next group

WORD GROUP 10 OF 10

91–100. Explaining what the number supports

Back to contents

The final words help turn technical vocabulary into a clear report. A good sentence gives enough information for another reader to understand the quantity and its scope.

No.Word or termMeaning and usageNatural collocationOriginal example
91measurementA value obtained by a defined measuring process.output measurementThe measurement must keep its unit and interval.
92estimateAn approximate value derived using evidence and assumptions.generation estimateAn estimate can be useful while retaining its uncertainty.
93intervalThe span between specified times or positions.operating intervalThe interval falls from five to four hours in the changed case.
94assumptionA condition accepted for a calculation or explanation.constant-output assumptionThe assumption lets us multiply net power by operating time.
95boundaryThe limit defining what a calculation or system includes.export boundaryThe boundary determines which internal uses must be subtracted.
96comparisonExamination of differences and similarities on a stated basis.like-for-like comparisonThe comparison uses the same unit and accounting boundary.
97uncertaintyIncomplete knowledge or stated limits surrounding a result.measurement uncertaintyUncertainty should remain visible beside the reported estimate.
98evidenceInformation supporting a conclusion.operational evidenceEvidence of commercial operation does not establish every later bill effect.
99qualificationA condition or limit making a claim more exact.necessary qualificationThe qualification labels our numerical plant as fictional.
100explanationAn account showing how or why something occurs.technical explanationThe explanation connects the heat source, conversion process and measured output.
91–100: Explaining what the number supports

Separate an estimate from a measurement and a target from an achieved result. Precise qualification does not weaken useful evidence; it stops one fact from being asked to prove a different claim.

Contents · Previous group · Use the words

Generation workshop: take the internal use out

Imagine a fictional small plant with constant gross electrical output of 2 megawatts. Its internal pumps and other equipment consume 0.2 megawatts during operation. Choose the export boundary after that internal use. Net export power is therefore 2 − 0.2 = 1.8 megawatts. These values are invented, and the model makes no claim about Dominica’s plant design or actual auxiliary demand.

Let the model operate at those constant values for five hours. Net exported energy is 1.8 megawatts multiplied by 5 hours: 9 megawatthours. Gross generated energy is 10 megawatthours; internal electrical use is 1 megawatthour. Subtracting those two energy amounts gives the same net result. The two routes agree because the quantities, interval and boundary are consistent.

Change one condition: a one-hour outage occurs within the same five-hour reporting window. Assume no generation or internal electrical consumption during that hour, and unchanged values during the remaining four operating hours. Net exported energy becomes 1.8 × 4 = 7.2 megawatthours. The nameplate rating has not changed. Actual energy over the reporting interval has changed.

This is an electricity-accounting model, not an efficiency calculation for the whole geothermal process. We have not supplied the thermal energy entering the conversion system. The ratio of net to gross electrical output describes an electrical accounting relationship, not the fraction of underground heat converted into electricity. Keep the input and output definitions visible before using the word efficiency.

Find the breakpoint. If the learner writes nine megawatts for the five-hour result, return to rate multiplied by time. If the units are right but the internal use is added instead of subtracted, redraw the boundary with an arrow consumed inside it. If the arithmetic is correct but the result is reported as an actual national figure, repair the model label.

Fade the support by giving only a fresh written case: gross power 3 megawatts, internal use 0.3 megawatts and two constant operating hours. Ask for net power and exported energy in separate sentences. They are 2.7 megawatts and 5.4 megawatthours. Tomorrow, add an outage and ask the learner which quantities stay unchanged. The explanation should survive the changed condition.

Dominica: a milestone changes the question

The Independent Regulatory Commission’s 26 August 2026 account records a Commercial Operation Date of 31 July 2026 after required testing. At the source check on 21 October 2026, that dated statement supplies a stronger basis than an older forecast about when a plant might open. Use the event date and publication date carefully: they are different pieces of the record.

The same account distinguishes reaching commercial operation from proving every anticipated customer effect. That is a useful reading lesson. A milestone establishes a stage; performance monitoring asks what happens afterwards. The regulator also publishes a later explanation concerning grid response to geothermal interruption. Together these sources encourage system questions rather than the assumption that one new generating source removes every operating challenge.

General geothermal technology has several conversion routes. The U.S. Energy Information Administration explains direct steam and binary-cycle arrangements, among others. In a binary cycle, heat is transferred to a separate working fluid. That general explanation helps read the vocabulary but does not identify Dominica’s exact equipment without a project-specific technical source. A technology diagram and an actual plant record perform different jobs.

Here is an original classroom exchange. Reader: “The report says megawatts. Can I compare that directly with the household’s kilowatthours?” Partner: “First identify power and energy, then the time interval and boundary. They are related quantities, not interchangeable labels.” Reader: “And will a new source lower every bill?” Partner: “That needs the current tariff, consumption and measured outcomes, not just the plant’s rating.”

Read the eduKate Dominica learning guide for the volcanic landscape, hydrothermal features and wider island context. It distinguishes a scientific learning model from a practical visit. A heat source can be studied from published material; this vocabulary guide supplies no field instructions or access guarantee. Dominica and the Dominican Republic are different countries and require different sources.

Practice: recall, explain and revise

1. A constant net output of 1.5 megawatts continues for four hours. State the energy.

2. Gross power is 4 megawatts and internal use is 0.4 megawatts. Find net power at the stated export boundary.

3. Why is the net-to-gross electrical ratio not automatically the thermal efficiency?

4. Revise “The rated capacity proves the plant generated that amount every hour.”

5. A forecast and a later operation notice disagree about timing. How should a paragraph handle them?

6. What information beyond a generation milestone would be needed to discuss an actual household bill?

Answers and explanations

1. Six megawatthours. The power is multiplied by the operating interval, and the unit changes from a rate to an energy amount.

2. Net power is 3.6 megawatts. The specified internal electrical use is subtracted from gross electrical output.

3. Thermal efficiency needs a defined heat input as well as useful work output. Gross and net here are both electrical quantities, so their ratio answers a different accounting question.

4. “Rated capacity describes potential under specified conditions. Actual generation requires operating data and an interval.” Keep power and energy units distinct.

5. Identify each document’s date and purpose. Present the earlier statement as a forecast and the later verified milestone as a later stage, rather than merging them into one undated claim.

6. The applicable tariff and charges, relevant consumption and billing period, plus evidence for any claimed change. This guide supplies no household-specific bill estimate.

Write energy English that keeps its units

For speaking, explain the fictional plant to a listener who cannot see the calculation. Say gross output, internal use, net power and operating interval. Ask the listener to repeat the final quantity with its unit. If they report megawatts for the five-hour energy result, find the sentence where the distinction became unclear.

For writing, prepare a short energy-news explainer with one dated source fact, one general technical relationship and one limitation. Keep the original model’s numbers away from the sourced national claim. A reader should never have to guess whether a quantity is an observed plant value, a forecast or a classroom assumption.

A student who confuses heat and electricity needs a conversion diagram. A student who confuses megawatts and megawatthours needs a rate-and-time example. A student who calculates correctly but treats a target as an outcome needs source labels and reporting verbs. These require different next lessons even if the final paragraph initially looks equally uncertain.

Parents can ask one practical question: “What does this number measure?” Teachers can keep a small error record for quantity, unit, interval, boundary and source. Use a changed-condition task after a delay and reduce prompts as control grows. The aim is a learner who can read a new energy story without needing this exact worked example beside it.

The English Tuition | Dominica guide distinguishes stated information from inference and uses materials appropriate to the learner’s actual route. That habit transfers to technical news. It does not make this list a CSEC syllabus or establish a local eduKate centre. Use current official course materials for any examination-specific preparation.

Frequently asked questions

Does geothermal mean electricity?

Geothermal refers to heat within the Earth. That heat can have different uses. Electricity generation requires a conversion system; the resource and the electrical product are different parts of the explanation.

Are these Dominica plant output figures?

No. Every calculation in the workshop is invented. The local factual milestone is attributed to the regulator’s dated account, while the numerical model teaches general units and accounting.

Why include binary cycle if it is not used to identify this plant?

It is useful vocabulary for reading general geothermal explanations and comparing technologies. The guide explicitly separates a general technology type from a verified project-specific description.

Is capacity the same as generation?

No. Capacity describes potential or a rating under stated conditions. Generation is the production of electrical energy and needs an interval when expressed as an amount.

What is the best first learning task?

Explain one conversion relationship or one rate-and-time calculation. Use the right units, then change a condition. Accurate use of a few terms provides a stronger base than memorising all equipment names without understanding their roles.

Sources and the scope of this guide

Sources checked on 21 October 2026. Local milestones are dated and attributed. All numerical scenarios and dialogue are original teaching material. General technology descriptions are not presented as a verified equipment inventory for Dominica. The guide makes no customer-price prediction, investment claim or operational recommendation.

Independent Regulatory Commission: Commercial operation account — Published 26 August 2026; records the 31 July 2026 milestone and separates operation from customer-outcome monitoring.

Independent Regulatory Commission: Grid response to interruption — A later system-level discussion, read as a dated account rather than a guarantee of present availability.

U.S. Energy Information Administration: Geothermal power plants — General conversion technologies and component relationships.

U.S. Energy Information Administration: Measuring electricity — Power and energy units and their relationship through time.

U.S. Energy Information Administration: Electricity glossary — Technical electricity vocabulary and accounting senses.

U.S. Department of Energy: Geothermal direct use — The distinction between direct heat use and electricity conversion.

Oxford Learner’s Dictionaries: geothermal — The English adjective’s meaning and use.

Next: one number with its full meaning

Choose a technical paragraph and underline each quantity. Add its unit, interval and source in your notes. Then explain the paragraph in ordinary language without changing what the quantities mean. Keep one corrected sentence for the next session, so your learning continues from the actual point of difficulty.

Continue through the eduKateSG Vocabulary hub and eduKate Vocabulary Learning System. Practise meanings, contrasts, retrieval and fresh explanations. A well-chosen word can make a complicated system visible; a well-labelled unit can stop an entire paragraph taking the wrong turn.